Gone are the days when you had to wait in the queue long and long at the fuel station until your turn came! Now you can easily charge your electric Audi at home with your own Audi Electric Charging Stations! But before you proceed to set up an EV charging station at your property, you must know the basics of the installation procedure. And here we are with a comprehensive guide.
Different types of Audi Electric Charging Stations and their installation procedures
Chiefly there are three types of electric vehicle chargers with which you can charge your electric Audi at your place conveniently. Moreover, these chargers are very energy efficient, thus there is no chance of ending up getting huge electricity bills. However coming to the core part, those three type includes:
Level 1 EV charger and it’s an installation
Basically, level 1 electric vehicle chargers appear as an additional accessory with your electric car. And installing this charger does require professional assistance. However, the procedure is pretty simple. All you need is to set up a 120-volt wall outlet. Once the installation is accomplished you just need to plug in your level 1 EV charger into it, put the charging point in your vehicle, and there you go!!
The best part about this particular electric vehicle charging station is you do not even need to spend a hefty amount to set it up.
Level 2 electric vehicle charger and its installation
Yet another great option to set up your Audi Electric Charging Stations is installing a 240 or 220-volt outlet for the electric car. In fact, through this, your electric vehicle can charge itself faster and better. However, the whole setup requires special efforts, and should only be practiced under expert guidance.
The necessary steps:
Step 1: the outlet installation
While installing level 2 Audi Electric Charging Stations you need to run 240 volts of electricity to the charging location from the breaker panel. And, for that, the electrician handling the installation program might need to attach a double pole circuit breaker to two 120 volt outlets at once to twice the amount of the circuit voltage with the help of a 4-strand or heavy cable.
Step 2: The wiring
If you think about it from the wiring perspective, you would need to connect the earth-in wire to the ground bus bar, a regular wire to the wire busbar, and lastly two how wires to the pole breaker. Also, you might need to replace the breaker box completely for having a well-matched interface. And during the process make sure to shut down all the power supplies into the breaker box.
Step 3: safety measures to check
Now that everything is on the perfect track and your circuit breaker is connected to your home wiring accurately, you are all set to run your 4 strand or heavy cable to the charging location. Nevertheless, make sure that the newly installed cable is properly insulated and protected with armor to avoid any unforeseen accident.
Step 4: The mounting
The last phrase involves mounting your charging unit to your charging station, connecting it to a 240-volt cable.
Note: Administering the above-discussed steps of electric car charger installation at home without professional guidance is definitely not a smart move. To ensure safety and security you should always hire a professional electrician or simply call us for help.
Level 3 electric vehicle charger and its installation
The last and final EV charger in today’s list is a level 3 electric charger. Primarily, this charger is widely used in commercial and industrial establishments. It is pretty expensive and needs powerful electrical tools and equipment for optimal operation. This is why this type of DC fast charger is not compatible with homes.
Specifications
Level 3 EV chargers are capable of charging a vehicle about 80% in just thirty minutes. These superchargers are the best fit for roadside stations.
Things to consider before setting up a level 3 EV charger
Site assessment
Before installing a level 3 EV charger the professionals usually run a site analysis to ensure the infrastructure is adequate for the installation program. This includes assessing the site location, checking out the lighting as well as security measures, and considering the utility needs.
Planning the infrastructure
In the second step, the professionals draft a diagram, representing the electrical distribution of that particular site. Later on, they initiate the project by pouring concrete, boring holes, trenching, and landscaping.
Final installation
Once they complete all the assessment checks, the professionals proceed with the project along with the site engineers and contractors. This involves installing electrical wires, piping, and running conduits.
Hopefully, now you are aware of the to and for of Audi Electric Charging Stations and their installation program. In case you need any help in electric car charger installation, feel free to contact us.